Control and valve repairers
Official title Control and Valve Installers and Repairers, Except Mechanical Door (SOC 49-9012)
In brief
In May 2025, BLS counted 48,240 US control and valve repairers, with median pay of $74,340 a year. By the method BLS used before May 2021, the highest count from 2003 to 2020 was 52,270, in May 2019. The earliest figure here is an estimate of 58,000 from 1990, not measured the same way as today's count. The last full technology era for control and valve repairers: Advanced Metering Infrastructure smart meter rollout, 2005 to 2022.
Official statistic: latest count and pay, highest count.Researched context: earliest figure.
What the sources say
Official outlook
BLS projects employment to grow 4.3% from 2025 to 2035.
BLS Employment Projections 2025-35
Official statistic
Data as of BLS OEWS May 2025; BLS Employment Projections 2025-35. BLS publishes these counts as yearly survey snapshots and cautions against reading them as a precise trend. In May 2021 BLS changed how it estimates these counts (a model-based method using three years of survey data) and moved fully to the 2018 occupation codes, so part of a change across 2021 can come from the method rather than the work.
Last updated .
Cite this page
Future History. (2026, October 31). Control and valve repairers: jobs and pay since 1956 [Data set; data as of BLS OEWS May 2025; BLS Employment Projections 2025-35]. https://futurehistory.earth/timeline/49-9012
Future History. "Control and valve repairers: jobs and pay since 1956." Data as of BLS OEWS May 2025; BLS Employment Projections 2025-35. Last modified October 31, 2026. https://futurehistory.earth/timeline/49-9012.
@misc{futurehistory_49_9012, author = {{Future History}}, title = {Control and valve repairers: jobs and pay since 1956}, year = {2026}, month = oct, howpublished = {\url{https://futurehistory.earth/timeline/49-9012}}, note = {Last updated 2026-10-31. Data as of BLS OEWS May 2025; BLS Employment Projections 2025-35}, }
The access date is today's date on your device.
≈ $72,434 in 2024 prices (derived by us, CPI-adjusted)
August 14, 1888: Oliver B. Shallenberger of Westinghouse Electric receives a patent for the induction watt-hour meter in Pittsburgh. The device uses a spinning aluminum disk to integrate power consumption over time, providing utilities the first reliable method to bill customers accurately for electricity used. Within five years, the watt-hour meter is the standard instrument for every AC electric service connection in the United States, and the occupation of "electric meter man" is born alongside it.
The first 1,000-mile natural gas pipeline, running from Amarillo, Texas to Chicago, is completed in 1931. Combined with improved welded-steel pipe developed during and after World War II, this begins a continental build-out that transforms natural gas from a regional byproduct of oil wells into the dominant residential heating fuel. Each new residential connection requires a pressure regulator and a meter installation, work performed by utility service workers who become a distinct occupational cohort within the gas industry.
The Utility Workers Union of America is formally chartered on August 1, 1945, bringing together gas and electric utility service workers including meter installers, servicemen, and valve technicians under a single industrial union affiliated with the CIO. The UWUA's early collective bargaining agreements standardize apprenticeship lengths (typically 4 years), establish safety protocols for gas and high-voltage work, and negotiate wage scales that place utility meter and service workers among the better-paid skilled trades. By 1955 the UWUA affiliates with the AFL-CIO following the labor federation merger.
The American Gas Association reports that the US gas industry is serving 30.1 million customers, of which 27.9 million are residential and 2.3 million are commercial. In the mid-1950s, utilities are adding roughly 800,000 new gas customers per year, each requiring a pressure regulator and meter installation. American homeowners are switching en masse from coal furnaces to natural gas furnaces, attracted by the cleanliness and convenience of piped gas. The gas serviceman of this era is at the peak of new-connection demand.
The Energy Policy Act of 2005 contains the first federal provision on "Smart Metering," directing utilities to offer time-based rates and enabling technologies. The Energy Independence and Security Act of 2007 follows with stronger mandates. The resulting Advanced Metering Infrastructure deployment campaign touches off a decade-long wave of physical meter-replacement work: every rotating-disk electric meter in a utility's territory must eventually be swapped for a communicating digital unit, all done by field workers. By 2013, AMI meters outnumber the older AMR units in the residential sector for the first time.
By the end of 2020, 90 million electric meters in the United States are operating in AMI mode, while 29 million remain on the older AMR (one-way automated reading) standard. The first-generation AMI 1.0 fleet will begin reaching end-of-life in the mid-2020s to early 2030s, setting up a second large-scale replacement cycle. On the natural gas side, PHMSA pipeline safety regulations issued through the 2010s mandate periodic exercising, inspection, and calibration of automatic shutoff valves on gas distribution mains, creating a compliance-driven maintenance workload for control and valve workers independent of new-connection activity.
Will AI replace control and valve repairers? What the research says
Each figure is stated by the named source; we publish no forecasts of our own. Where sources disagree, we show the disagreement rather than an average.
Each figure is stated by the named source; we publish no forecasts of our own. Where sources disagree, the spread is the honest signal.
- BLS Employment Projections 2025-35Target year 2035
What's changing day to day for control and valve repairers
Three parts of your work where AI is already doing real lifting, and what stays yours.
AI is sitting alongside you here Record maintenance information, including test results…
, material usage, and repairs made.[2]
AI is sitting alongside you here Disassemble and repair mechanical control devices or valves…
, such as regulators, thermostats, or hydrants, using power tools, hand tools, and cutting torches.[2]
AI is sitting alongside you here Lubricate wearing surfaces of mechanical parts…
, using oils or other lubricants.[2]
How has the work of control and valve repairers changed since 1888?
The tools that defined the work, one line per era. Select an era to see how it reshaped the work.
Induction watt-hour meter + diaphragm gas meter (Shallenberger 1888, rotating disk era)
Oliver Shallenberger's 1888 watt-hour meter used a rotating aluminum disk driven by electromagnetic induction to accumulate kilowatt-hour totals mechanically, a design so reliable it remained in production for over a century. The gas side ran on diaphragm meters whose flexible chambers expanded and contracted as gas flowed through, turning a mechanical register. Installing either type of meter required a field worker to mount the meter enclosure, make the incoming service connection, set the meter index to zero, and test it against a calibration standard. The calibration standard itself, a portable dead-weight tester or calibrated reference meter, was the workhorse of the meter test bench. A "meter man" in 1910 carried a toolkit of spanners, pipe wrenches, pressure gauges, and a portable ohmmeter, and worked out of a horse-drawn (later motor vehicle-mounted) service truck.
Welded steel pipeline + high-pressure regulator (pipeline expansion era, 1931-1965)
The first 1,000-mile natural gas pipeline connecting Amarillo, Texas to Chicago was completed in 1931, and the war years brought advances in welded-steel pipe and arc welding that made long-distance gas transmission economical. The postwar residential boom drove a staggering acceleration: the American Gas Association reported 30.1 million US gas customers by 1956, and roughly half the existing mainline natural gas transmission network was installed in the 1950s and 1960s. Every new residential customer required a regulator at the service meter to reduce distribution pressure down to appliance pressure, plus a meter set to measure consumption. The meter-setter and service-person of this era worked from a panel truck carrying diaphragm meters in bulk, pressure regulators, flaring tools, pipe cutters, and a portable mercury manometer for pressure testing. Safety checks included leak-testing with soapy water and testing safety shutoffs. The Utility Workers Union of America, formally constituted in 1945-1946, secured apprenticeship programs and standardized testing requirements for meter installation workers across the major gas utilities.
Effect on the workThe 1940s-1960s natural gas pipeline boom was the high-water mark of employment growth for this occupation. Gains of 800,000 new gas customers per year were recorded in the mid-1950s, each requiring a new meter set and regulator installation. Employment in meter-installation and valve-maintenance roles likely peaked in the early 1960s as the initial connection wave was completed and subsequent work shifted more toward maintenance and replacement.
Solid-state metering + electronic test equipment (digital calibration era)
The 1970s introduced solid-state electronic components into utility metering: digital registers replaced mechanical odometer-style counters, electronic test sets replaced portable reference meters and dead-weight testers, and portable handheld computers allowed field workers to log meter reads and calibration results electronically rather than on paper. Natural gas regulators gained more precise spring designs and temperature-compensation diaphragms in this era. For the field worker, the most significant shift was in calibration tooling: analog clip-on ammeters and mercury manometers gave way to digital clamp meters and electronic pressure transducers that displayed readings with greater precision and logged results for utility records. The work was still fundamentally hands-on and physically demanding, requiring the same pipe wrenches, flaring tools, and safety equipment as before, but the test-and-record portion of each service call became faster and more accurate.
Advanced Metering Infrastructure (AMI) smart meter rollout (Energy Policy Act 2005 onward)
The Energy Policy Act of 2005 contained the first federal provision on "Smart Metering," touching off a decade-long AMI deployment campaign across US electric utilities. The Energy Independence and Security Act of 2007 accelerated the rollout. By 2013, AMI meters outnumbered the older one-way Automated Meter Reading (AMR) units for the first time in the residential sector. By the end of 2020, 90 million meters were operating in AMI mode. For the 49-9012 workforce, the AMI era was a decade of intensive installation work: every electromechanical rotating-disk meter in a utility's service territory eventually required physical replacement with a digital communicating unit. The installation itself was faster than a traditional meter set (no calibration required: the AMI unit ships factory-calibrated), but the volume of replacements drove sustained employment demand. On the gas side, smart gas meters and automated valve shutoffs began appearing in new construction, and advanced pressure regulators with remote-readable diagnostic ports became standard in higher-pressure industrial and commercial service.
Effect on the workThe AMI deployment wave sustained meter-installer employment through the 2000s and early 2010s despite the smaller per-installation labor content of smart meters versus traditional electromechanical units. After the initial deployment wave concluded (roughly 2018-2022), the installed base created an ongoing maintenance workload but reduced the volume of new-installation work, contributing to a modest contraction in total occupation employment between 2000 and 2024.
Next-generation AMI 2.0 + IIoT valve monitoring (grid modernization and infrastructure-hardening era)
As the first-generation AMI 1.0 smart meter fleet approaches the end of its rated life (several years for residential units, meaning 2020-2030 replacement cycles for the units deployed 2005-2015), utilities are planning AMI 2.0 deployments with two-way broadband communication, edge computing capability, and tighter integration with demand response and outage management systems. On the natural gas side, the US Department of Transportation's Pipeline and Hazardous Materials Safety Administration (PHMSA) issued pipeline safety rules in the 2010s and 2020s mandating pressure-monitoring, valve inspection, and automatic shutoff valves on higher-consequence pipelines. These regulatory requirements create sustained work for valve and control installers and repairers: every automatic shutoff valve on a gas distribution main must be periodically exercised, calibrated, and tested to confirm it closes within specification. The present-day worker carries a rugged handheld device loaded with the utility's asset management system, connects to smart-meter communications networks via proprietary protocols, and diagnoses valve actuator performance via diagnostic ports, but still does the physical work of torquing fittings, pressure-testing seals, and confirming safety shutoff action in the field.
See the same long-arc view for your own profession.
Browse the directory by industry, or search by title or SOC code.
Browse all rolesControl and Valve Installers and Repairers, Except Mechanical Door employment and pay by year
View all 26 years of cited US data, each linked to its source
| Year | US employment | Annual pay (median unless marked) | Source | Report |
|---|---|---|---|---|
| 1956 | n/a | $4,200 (average) | Est., University of Missouri Libraries[4] Researched context | Report |
| 1990 | 58,000 | n/a | Est., Utility Workers Union of America[1] Researched context | Report |
| 2000 | 56,000 | n/a | Est., O*NET / BLS[2] Researched context | Report |
| 2003 | 37,840 | $42,540 | BLS OEWS May 2003[3] Official statistic | Report |
| 2004 | 37,260 | $43,710 | BLS OEWS May 2004[3] Official statistic | Report |
| 2005 | 38,640 | $44,120 | BLS OEWS May 2005[3] Official statistic | Report |
| 2006 | 42,270 | $45,440 | BLS OEWS May 2006[3] Official statistic | Report |
| 2007 | 43,160 | $46,140 | BLS OEWS May 2007[3] Official statistic | Report |
| 2008 | 43,900 | $47,040 | BLS OEWS May 2008[3] Official statistic | Report |
| 2009 | 42,180 | $47,240 | BLS OEWS May 2009[3] Official statistic | Report |
| 2010 | 43,430 | $48,430 | BLS OEWS May 2010[3] Official statistic | Report |
| 2011 | 42,450 | $49,600 | BLS OEWS May 2011[3] Official statistic | Report |
| 2012 | 40,310 | $50,960 | BLS OEWS May 2012[3] Official statistic | Report |
| 2013 | 40,940 | $52,980 | BLS OEWS May 2013[3] Official statistic | Report |
| 2014 | 41,290 | $53,140 | BLS OEWS May 2014[3] Official statistic | Report |
| 2015 | 42,510 | $54,100 | BLS OEWS May 2015[3] Official statistic | Report |
| 2016 | 45,740 | $54,520 | BLS OEWS May 2016[3] Official statistic | Report |
| 2017 | 47,700 | $55,850 | BLS OEWS May 2017[3] Official statistic | Report |
| 2018 | 51,730 | $56,070 | BLS OEWS May 2018[3] Official statistic | Report |
| 2019 | 52,270 | $58,100 | BLS OEWS May 2019[3] Official statistic | Report |
| 2020 | 50,660 | $60,580 | BLS OEWS May 2020[3] Official statistic | Report |
| 2021 | 44,870 | $62,760 | BLS OEWS May 2021[3] Official statistic | Report |
| 2022 | 46,410 | $64,810 | BLS OEWS May 2022[3] Official statistic | Report |
| 2023 | 47,780 | $70,100 | BLS OEWS May 2023[3] Official statistic | Report |
| 2024 | 46,920 | $74,690 | BLS OEWS May 2024[3] Official statistic | Report |
| 2025 | 48,240 | $74,340 | BLS OEWS May 2025[3] Official statistic | Report |